Manual
Table Of Contents
- Contents
- 1 Introduction
- 2 Getting Started
- 3 Basic Operation
- 4 Sonde Menu
- 5 PC6000 Software
- 6 Principles of Operation
- 7 Maintenance
- 8 Troubleshooting
- 9 Communication
- Appendix A Health and Safety
- Appendix B Require Notice
- Appendix C Warranty and Service Information
- Appendix D Accessories and Reagents
- Appendix E Application Note
- Appendix F Solubility and Pressure/Altitude Tables
- Appendix G Sensor and Sonde Storage Recommendations
- Appendix H Turbidity Measurements with the 6000UPG
- Appendix I System Errors and Warnings

2-13
STEP 3. INSTALL BATTERIES
NOTE: Some 6000UPGs are not configured with internal battery capability. If the 6000UPG you
have purchased is configured to operate from internal batteries, it will have a battery compartment
and battery lid as illustrated below.
If your 6000UPG does not have a battery compartment, ignore
these battery installation instructions.
Your first set of batteries is supplied with the instrument. Install 8 C-size
alkaline batteries as follows:
Use the hex driver, supplied in the 6040 Maintenance Kit, to loosen the
battery lid screws.
NOTE: The battery lid screws are captive. It is not necessary to remove
them from the lid completely.
Remove the battery lid and install the batteries, as shown.
NOTE: Observe the correct polarity before installing the batteries into
the battery chamber.
Be sure the bottom O-ring is installed in the groove of the lid. Check the
O-ring and sealing surfaces for any contaminates which could interfere
with the O-ring seal of the battery chamber. Remove any contaminates
present. Also clean the protective O-ring which located in the middle of
the side of the battery lid.
Apply a very thin coat of O-ring lubricant (supplied in the 6040 Maintenance Kit) to both battery
chamber O-rings.
Return the battery lid and tighten the screws.
DO NOT OVER TIGHTEN.