Technical data

backup archive upon its creation completion" is to be marked to
switch on the validation of the created archive.
The possible options are described in ⑦ in chapter 9.2.4 "Creating
Image Archives " on page 60.
9. Archive Comments
Here, a meaningful comment about the image archive file can be entered.
This comment simplifies the identification of the image archive at a later
time.
10. Task Running Scheduling
Here the execution time of the task is displayed. In the example Daily is
selected.
11. Daily Execution of Task
Possible times are:
Start time
Starting time of the task is displayed.
Every day
The task is executed every weekday.
Weekdays
The task is executed only at weekdays.
Every
Execution in certain day intervals.
Repeat task every
Multiple daily execution of a task.
12. User Information
Enter and confirm your user name and login keyword.
Note: If no login keyword is entered, the task possibly cannot be executed.
13. Finish
Finishing the wizard and saving the task.
9.3 Software for UPS Monitoring
9.3.1 General Information
This UPS NT software controls and monitors the external uninterrupted power
supply for the panel PC and the control cabinet PC.
The communication between the program and the UPS is performed via a vir‐
tual serial interface via an USB port (default port is XUSB2).
The program runs as Windows service. It is started automatically during system
start-up and can be finished or deactivated only by an authorized user.
The UPS logic is designed for a safe shutdown of all application
programs as well as of the operating system. It is not designed to
maintain the operation in case of a longer voltage breakdown!
Project Planning Manual | Rexroth IndraControl VSB 40.3 Electric Drives
and Controls
| Bosch Rexroth AG 71/101
Software