Service Manual
Table Of Contents
- Title Page
- Revision History
- Reader Comments
- Preface
- Table Of Contents
- 1 - Safety
- 2 - Product Records and Maintenance
- 3 - Kubota Diesel Engine
- 4 - Hydraulic System
- Specifications
- General Information
- Hydraulic Schematics
- Hydraulic Flow Diagrams
- Special Tools
- Troubleshooting
- Testing
- Traction System Operation Testing
- Charge Relief Valve Pressure Test (Using Pressure Gauge)
- Transmission Piston Pump Flow Test (Using Tester with Pressure Gauges and Flow Meter)
- Traction Relief Valve Pressure Test (Using Tester with Pressure Gauges and Flow Meter)
- Wheel Motor Efficiency Test (Using Tester with Pressure Gauges and Flow Meter)
- PTO Pressure Valve Test (Using Pressure Gauge)
- Implement Relief Pressure Test (Using Pressure Gauge)
- Gear Pump Flow Test (Using Tester with Pressure Gauges and Flow Meter)
- Lift Cylinder Internal Leakage Test
- Service and Repairs
- General Precautions for Removing and Installing Hydraulic System Components
- Flush Hydraulic System
- Charge Hydraulic System
- Hydraulic Tank
- Wheel Motors
- Wheel Motor Service
- Transmission
- Transmission Service
- Gear Pump
- Gear Pump Service
- Manual Lift Control Valve (SN Below 313000000)
- Manual Lift Control Valve Service (SN Below 313000000)
- Lift Control Manifold (SN Above 313000000)
- Lift Control Manifold Service (SN Above 313000000)
- Polar TracTM Hydraulic Control Valve
- Polar TracTM Hydraulic Control Valve Service
- Lift Cylinder
- Lift Cylinder Service
- Polar TracTM Lift Cylinder
- Polar TracTM Lift Cylinder Service
- Oil Cooler
- 5 - Electrical System
- Electrical Schematics and Diagrams
- Special Tools
- Troubleshooting
- Electrical System Quick Checks
- Component Testing
- Ignition Switch
- Indicator Lights
- Hour Meter
- PTO Switch
- Neutral Switches
- Seat Switch
- Parking Brake Switch (SN Below 310000000)
- Parking Brake Switch (SN Above 310000000)
- Standard Control Module
- Standard Control Module Logic Chart
- PTO Solenoid Valve Coil
- Lift Control Manifold Solenoid Valve Coils (SN Above 313000000)
- Fusible Link Harness
- Diode Assembly
- Glow Relay
- High Temperature Warning Switch
- High Temperature Shutdown Switch
- Dual Temperature Switch (Polar TracTM Machines)
- Deck Lift/Lower Switch (SN Above 313000000)
- Fuel Pump
- Fuel Stop Solenoid
- Glow Controller
- Service and Repairs
- 6 - Chassis
- 7 - Cutting Deck
- 8 - Foldout Diagrams
- Electrical Drawing Designations
- Hydraulic Schematics
- Hydraulic Schematic (SN Below 313000000)
- Hydraulic Schematic (SN Below 313000000) with Rear Attach Lift Kit
- Hydraulic Schematic (SN Below 313000000) with Polar Trac Installed)
- Hydraulic Schematic (SN Below 313000000) with Polar Trac and Rear Attach Lift Kit
- Hydraulic Schematic (SN From 313000001 to 314999999)
- Hydraulic Schematic (SN Above 315000000)
- Electrical Schematics
- Circuit Diagrams
- Wire Harness
Groundsmaster 7200/7210 Page 7 – 15 Cutting Deck
5. Disconnect PTO drive shaft from gearbox (see PTO
Drive Shaft Removal).
6. Remove four (4) cap screws (item 10) and lock wash-
ers (item 11) that secure gearbox assembly to gearbox
brackets.
7. Remove fasteners that secure left side gearbox
bracket (item 3) to deck mounting plate. Remove brack-
et from deck.
8. Remove gearbox assembly, with drive pulley at-
tached, from deck. Drain lubricant from gearbox.
9. Remove two (2) set screws that secure taper lock
bushing to drive pulley on gearbox shaft.
10.Thread one of the removed set screws into threaded
hole of bushing (Fig. 16). Tighten set screw to loosen
bushing from pulley hub.
11. Slide bushing and pulley from gearbox shaft. Locate
and retrieve woodruff key.
12.If necessary, remove and replace oil seals and oil
caps in gearbox (Fig. 17).
NOTE: If internal gearbox wear or damage occurs,
gearbox replacement is necessary. Internal gearbox
components are not available.
Installation (Fig. 15)
1. Clean gearbox output shaft, pulley ID and taper lock
bushing thoroughly.
2. Position woodruff key, pulley and then taper lock
bushing to gearbox output shaft. Slide bushing to shoul-
der on shaft. Align threaded holes of pulley with non–
threaded holes of bushing.
3. Lightly oil threads of set screws and install screws
into threads of pulley (Fig. 16). Alternately and evenly
tighten set screws to a torque from 180 to 250 in–lb (20
to 28 N–m).
4. Fill allen recess in set screws and bushing threads
with grease to prevent dirt from packing into crevices.
5. Position gearbox assembly, with drive pulley at-
tached, to deck.
6. Position and secure left side gearbox bracket (item
12) to deck mounting plate.
7. Secure gearbox assembly to gearbox brackets with
four (4) cap screws (item 10) and lock washers (item 11).
8. Connect PTO drive shaft to gearbox (see PTO Drive
Shaft Installation).
9. Install drive belt and deck covers to cutting deck.
10.Torque plug in gearbox to 175 in–lb (19.8 N–m). Fill
gearbox with lubricant.
11. Lower the footrest.
1. Set screw installation position
2. Set screw removal position
Figure 16
2
1
1
1. Oil cap
2. Dipstick
3. Oil cap
4. Gearbox
5. Oil seal
6. Plug
Figure 17
175 in–lb
(19.8 N–m)
175 in–lb
(19.8 N–m)
5
3
2
1
4
6
6
Cutting
Deck