Service Manual

Table Of Contents
Groundsmaster 7200/7210Page 7 – 10Cutting Deck
Blade Spindle
1. RH spindle assembly
2. Drive belt
3. Idler pulley
4. Center spindle assembly
5. Idler pulley
6. Drive belt
7. LH spindle assembly
8. Cutting deck
9. Drive pulley
Figure 6
FRONT
RIGHT
2
7
3
4
5
1
9
6
8
Removal (Fig. 6)
1. Park machine on a level surface with cutting deck
raised. Stop engine, engage parking brake and remove
key from the ignition switch. Support the cutting deck so
it cannot fall accidentally.
2. Lift the footrest, exposing the top of the cutting deck.
Support the footrest with prop rod.
3. Remove belt covers from top of cutting deck.
NOTE: When removing deck drive belt, use breaker
bar in idler arm square drive holes to rotate idler pulley
away from belt (Fig. 7).
4. Remove drive belt from deck pulleys (see Operator’s
Manual).
1. Idler arm (RH shown)
2. 1/2” square drive
3. 3/8” square drive
Figure 7
1
2
3