User manual
Commissioning a project
6.4 Transfer
Basic Panels 2nd Generation
Operating Instructions, 03/2014, A5E33293231-AA
67
Note
If automatic transfer is activated on the HMI device and a transfer is initiated on the
configuration PC, the project currently running is automatically stopped. The HMI device then
automatically switches to "Transfer" mode.
After the commissioning phase, deactivate the automatic transfer so that the HMI device
cannot be inadvertently switched to transfer mode. Transfer mode can trigger unintentional
actions in the system.
You can issue a password in the Start Center to restrict access to the transfer settings and
thus avoid unauthorized modifications.
Requirements
● The project is open in WinCC.
● The project is compiled.
● The HMI device is connected to a configuration PC.
● The data channel parameters are assigned on the HMI device.
● The automatic transfer is enabled in the Start Center.
Procedure
If you are loading a project to an HMI device for the first time, the "Advanced loading" dialog
is automatically opened. You configure the appropriate interface parameters in this dialog.
For further information, refer to the WinCC documentation.
Proceed as follows:
1. If you want to load a project simultaneously to several HMI devices, use multiple selection
to select all the desired HMI devices in the project tree.
2. Select the "Load to device > Software" command in the shortcut menu of an HMI device.
3. When the "Advanced loading" dialog appears, configure the "Settings for loading":
– Select the interface via which the project will be loaded.
– Configure the corresponding interface parameters.
– Click on "Load".
You can open the "Advanced loading" dialog at any time with the menu command
"Online > Advanced loading to device…".
The "Load preview" dialog" opens. The project is compiled at the same time. The result is
displayed in the "Load preview" dialog.
4. Check the displayed default settings and edit them, if necessary.
5. Click on "Load".