User manual

Commissioning a project
6.4 Transfer
Basic Panels 2nd Generation
66 Operating Instructions, 03/2014, A5E33293231-AA
Procedure
If you are loading a project to an HMI device for the first time, the "Advanced loading" dialog
is automatically opened. You configure the appropriate interface parameters in this dialog.
For further information, refer to the WinCC documentation.
Proceed as follows:
1. If you want to load a project simultaneously to several HMI devices, use multiple selection
to select all the desired HMI devices in the project tree.
2. Select the "Load to device > Software" command in the shortcut menu of an HMI device.
3. When the "Advanced loading" dialog appears, configure the "Settings for loading":
Select the interface via which the project will be loaded.
Configure the corresponding interface parameters.
Click on "Load".
You can open the "Advanced loading" dialog at any time with the menu command
"Online > Advanced loading to device…".
The "Load preview" dialog" opens. The project is compiled at the same time. The result is
displayed in the "Load preview" dialog.
4. Check the displayed default settings and edit them, if necessary.
5. Click on "Load".
Result
The project is available on the HMI device following successful transfer. If the "Autostart"
function is activated in the Start Center, the transferred project is started automatically.
6.4.3
Starting the transfer automatically
Introduction
If automatic transfer is activated, the HMI device automatically changes to "Transfer" mode
at runtime as soon as a transfer is started on the connected configuration PC.
Automatic transfer is particularly suited for the test phase of a new project because transfer
is completed without interfering with the HMI device.