Technical data

37
SERVICE MENUSERVICE MENU
SERVICE MENUSERVICE MENU
SERVICE MENU
Cooling down (not DW20.1)
Machines with softener : Cool down step is NOT performed during regeneration.
Drain pump 5 sec
Inlet valve 24 sec
Circulation pump 60 sec
Drain pump 25 sec
Pre-rinse
Inlet valve 170 pulse*, 14 sec, 0.9 lit
Circulation pump 20 sec, Lower arm low pressure **
Drain pump 25 sec
1st. Rinse
Inlet valve 605 pulse*, 47 sec, 3.1 lit***
545 pulse* 43 sec, 2.8 lit**
Circulation pump 9 min
Circulation pump 60 sec, Upper arm high pressure**
Drain pump 2 sec SCS stage
Circulation pump 20 sec SCS stage, Upper arm high pressure **
Drain pump 25 sec
Final rinse
Inlet valve 605 pulse*, 47 sec, 3.1 lit***
545 pulse* 43 sec, 2.8 lit**
Circulation pump 60 sec
Circulation pump, Heater 60°C Temperature stop
Circulation pump, Combined dispenser 60 sec
Circulation pump 4 min
Circulation pump 50 sec, Upper arm high pressure **
Pause 60 sec
Drain pump 25 sec
Drying
Fan 48 min