Use and Care Manual

Precut Value Shed Manual
Workshop & Gable
Construction Manual © 2008-2009 Little Cottage Co. Page 14
79
80
81 82
83
84
Locate the window, shutters and trim.
Next install the window and fasten with 2”
nails as shown.
Next install the shutters and secure with pro-
vided screws for shutters.
Install 2 3/4” trim as shown and secure with 2”
nails.
Next install the bottom trim.
Locate 3” Smartside siding pieces and keep
ush with the top of the oor and secure with
2” nails.