Instructions User guide
Veris Technologies
Pub. #OM MSP03-1
25
pH Manager
Installation and Set-up
If the unit has been crated and delivered via closed-van commercial freight, the tongue (if equipped)
may need to be installed prior to use. Before doing so, please take precautions to ensure that the
framework is properly supported to ensure safety.
Remove bands that attach tongue assembly to shipping pallet. Use a forklift or small loader to
position tongue assembly to allow insertion of pins connecting tongue and toplink to MSP mainframe.
Prior to operating the implement for the first time, it is important to check all fasteners – some may
have loosened during shipment.
Route cables and hydraulic hoses along tongue and through hose guide. Tie-strap securely.
Connect signal cable to Veris instrument Output port and electrical cables to battery. Be careful to
attach black cable to negative/ground terminal. DO NOT REVERSE POLARITY.
Insert hydraulic ends into quick-couplers, being careful to insert the end marked “P” into the pressure
or oil output coupler, and the end marked “T” into the tank or return line coupler. Note: if not using
Veris-supplied hydraulic power pack, be certain that tractor or hydraulic power source is equipped
with open-center hydraulics. If tractor has closed center hydraulics, make sure MSP is equipped with
Closed Center Hydraulic Kit (part #26369) and that poppet valve is in closed center position (in).
12 V Power leads
-raise-lower
-external control module
pH signal cable
EC signal cable (if equipped)
Closed center
hydraulic kit
poppet valve