Instruction Manual

System Start-Up
Chapter 4
44
3. Select position 1 of the POWER switch. The POWER indicator lights
green; if it does not, refer to chapter 5 for troubleshooting aids.
Refer to the Advisor2 Installation and Start-up Guide, publication 6171-6.7.2
for information on creating a database.
Before you begin operations, you will need to know about the operating
system program. The 1770-M11 system needs the software of the operating
system program to communicate to the peripheral communication module. This
operating system program is located in two places:
within the hard disk unit
packaged on the micro-floppy labeled, Operating System for PLC-3
Peripheral Communication Module/Mass Storage System (Series B, Revision
A).
To load the program from the Winchester hard disk unit onto the DMIM, follow
these steps (Figure 1.17). Make sure the POWER switch is at position O.
System Startup Procedure for
the 1770M11 System
How to Load the Operating
System Program from the Hard
Disk