Prepare for Installation Assembly Parts How to Install the Closet Shell How to Install Toe Kicks How to Install Drawers How to Install Poles How to Install Adjustable Shelves
INSTALLATION TOOLS TAPE MEASURE “STUBBY” SCREWDRIVER WITH #2 PHILLIPS DRILL BIT DRILL/DRIVER WITH 3/16 DRILL BIT LEVEL DOCUMENTS There are 2 types of documents that will help guide you through the installation: this General Installation Manual outlining the assembly principles, and your product-specific Design Packet, including any specialty items assembly. These documents are provided directly to you with your order or available on the product page.
DESCRIPTION Double Sided Slip in Stud Screw-in Stud amm x 10 5mm Euro Screw #6 x 5/8 Flat Head Screws 6/32 x 1" Handle Screw Safety Shelf Pins Plastic Angle Bracket PART NUMBER 6126.000.65 6125.000.65 2320 000 65 2337.000.65 9965.100.65 2306.400.58 23396.000.00 USE Connector Bolt for Fixed Shelves: used when two fixed shelves are on the same level. side by side. Insert studs from the outside of the uptight towards the inside of the tower you're assembling.
Your unit shell consists of upright participant view elevation b sons and fixed shelves. A “tower” 28308 section between any two upright partial 7 AS sons. Assemble one “tower” at a time in : CAS -1 sequence from one side to the other. 80" Asmara— CAS 1114-T U14-T u1i4-T u14-T ; ; i Ration | Heedlessness | Herr 1. Begin the assembly with the “back o B e wall” unit standing wall-to-wall as shown DR . in Plan View of your Design Packet.
1. Fixed shelves have a locking mechanism called “cam” per-installed to receive the studs. Refer to the Elevation Drawing and locate all fixed shelves you will install in the first tower. 2. Lift the far-end upright and place it next to the wall. 3. Have your helper hold the second upright standing, while you insert the double-sided studs in the top row of holes and as applicable.
60" elevation b ks AS L114-T Ui4.1 } 485 578" CES H 85-5/8 £5 DR DR CES O fixed shelves on second lower G v e i The previously installed double-sided studs in your first tower will be used to assemble the fixed shelves on the same level in the second tower. 1. Use the Elevation Drawing to locate the correct size fixed shelves, as well as their heights in the second tower. 2. Measure the distance from the bottom to the corresponding holes on the second upright and install the screw-in studs. 3.
elevation a 38" o8 ovammbenmanans BT srmmcbimsssmonn T8 enmeshes " ora (RS CER GR* L Cg* | e 3"4 7 SD" L1147 Ult-1 U147 H: CES £ A% avian 41-3/4 36" 240 %2" CES CES (T ik R 06.7 /8" 28 o distance from back wall elevation a 3/8" 70 84" Qfi“ BT IS i Blamelessness CessRiiesREERN CES flCR“ 26“518" CR‘* 26"5!8 83_‘4 14 700 JgF A .xFu. 5‘?} 8‘“ e O 28" o double-sided studs placement elevation 96"k 26-7/8 83-14" ?2}§ QG“ 114-T U141 u14-T p 4875 578" B85-80 H 8558 OES CAFES i —CR12¥§ {ES (S B ATK ATk 8.
86 %!8“ elevation BT 8" meows SDH 240 %2" (e QR* H: Cg* 2 6“5181 i 4-T Ut-1 U147 “ H: —CRUFTS CES Tk e 2-718" 1K 14"W bridge piece 23“ @E Queue 83-14" ‘Bridge” piece is a custom fixed shelf (marked “CF) scammed on one side only. It connects the adjacent sections of your solution standing perpendicular to one another. 1. Using the Elevation Drawing and the parts list in your Design Packet, locate the correct size Bridge piece. 2.
elevation 841 cr 28378 FS CrS 83-1/4 § ey 318 ?2 A CAS i BE.314" { Ltd.1 14T 4.7 r48558" H 8347-172 kicks placement 1. Refer to the Elevation Drawing in your Design Packet to locate where each toe kick will be installed and pull the matching size from the box. 2. Install the studs on the first and the fourth hole on the front section of line boring. Use double-sided studs if you have a toe kick on both sides of the upright in your design. Otherwise, use the single sided screw-in studs. 3.
First, locate the 2 boxes with matching size drawer pieces, labeled the “drawer front” and the “drawer box’, as well as a set of drawer slides. The “drawer box” contains the drawer bottom, drawer back, the two drawer sides and the drawer hardware pack. 1. Place the drawer front on the ground face down and install the screw-in studs into per-drilled holes on the sides of the drawer front. The number of per-drilled holes will vary depending on the drawer height. 2.
1. Take the drawer bottom. Holding the finished side towards the interior of the drawer, slot it between the sides all the way to the drawer front. 2. Putting pressure on both sides, stand the drawer on its side. 3. Take the back piece and slot it between the sides. 4. Keeping the corners squared, install the 2 long screws on the drawer side. Holding the unfastened corner squared, flip the drawer and install the remaining 2 screws on the other side.
1. Each drawer slide set is made of two pieces. Take one set and fully extend the inner rail, exposing the black tab. 2. Slide the black tab and hold it in place, while you separate the 2 pieces. 3. Set aside the larger exterior piece. 4. Place the closed end of the interior rail towards the drawer front. 5. Align the holes on the rail with the per-drilled holes on the drawer side and install it using the small screws.
= 1th row of holes 2 = 15th row of holes 3 23rd row of holes rail placement The drawer bank Is Installed over a fixed shelf starting at the bottom and going up in sequence. 1. Locate 4 euro screws from the drawer hardware pack, as well as the the previously separated exterior rail of the drawer slide set aside in STEP 3. 2. Refer to the rail placement table Iin image 2 on the left. Starting from the bottom, count and mark the holes where each rail will be installed. 3.
elevation GR"‘ U14-T U14-T U14-T bash H: 855 FSH g5 58" start with lowest drawer 1. Refer to the Elevation Drawing on your Design Packet to locate the size of your drawers. 2. Take the drawer and line up the drawer box rails with the bottom rails of the upright partition, and slide the drawer inside. 3. As you slide the drawer towards the back, there will be initial tension In the sliding mechanism. 4. Using gentle even pressure, push the drawer all the way in.
1. Locate the drawer handle and handle screws. 2. Open the drawer and insert the screws from the inside of the drawer into the per-drilled holes. 3. Position the handle over one screw and tighten it halfway using a drill or a screwdriver. Insert the the second screw into the other side of the handle and fully tighten. Return to the first screw and tighten all the way. 4. Install all the remaining handles.
elevation b CES 72 AG==l CAGE AS 147 U14.7T 85.5/8 DR A B DR CAS R0 & GRS i K CTK i DRAMA il s 30 poles placement 25 BRY 7318 -z 1 T 578" 4741 Ar o moan 31-172" All poles are per-cut to fit your unit. 1. Refer to the Elevation Drawing in your Design Packet to locate where each size pole (marked “CR” custom rod) should be installed. Select the matching size from the box. 2. Unpack your pole cups. Each set includes a full-circle cup and a half-circle cup with pins on the back. 3.
elevation b kS 34“ GR"‘ CES {1 Adjustable shelf (marked comes with 4 per-drilled holes that rest on safety shelf pins to secure the shelf in place. You can install them at the suggested heights as shown in your Elevation Drawing, or move them as your needs change. 1. Use the Elevation Drawing to locate where each adjustable shelf is suggested to be installed. 2. Take your 4 safety shelf pins. Facing the pointed side up, install all 4 safety shelf pins at the same level by pressing them into the holes. 3.