Installation & Assembly
Site Prep – Before Your Product Arrives
outdoorlivingtoday.com/site-prep-before-your-product-arrives/
Before you order and receive your Outdoor Living product, download the specific Detailed
Assembly Manual found on our website and thoroughly review it.
Become familiar with the project and determine if you can complete the project yourself or will
require a professional contractor.
Please note that certain counties and municipalities require building permits prior to installation.
We recommend to all consumers that they check with their local county/municipality for these
specifics prior to purchasing any of our products since this is your sole responsibility.
Prior to the product arriving, clear the construction area. Remove all debris; roots, grass,
rocks, etc. Make sure the ground slopes away from the site at least 10 feet in all directions.
If necessary, build up the soil in the center of the site and slope away for the high point to
provide drainage. Fill in any low spots within the perimeter of the site. A slope of 1/8 inch per
foot is enough to prevent water accumulation.
We recommend excavating the site 4 inches deep and laying gravel or crushed rock where
drainage may be a concern.
What type of foundation should I use?
Patio Stone Foundation:
If the ground is stable and has sufficient drainage, you can set patio stones directly on firm
compacted soil. If not, lay on gravel or crushed rock.
Most of our Sheds and Playhouses include Floors with Runners that will sit directly on Patio
Stones.
4×4 Pressure Treated Beam Foundation: