Installation Instructions

2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm)
BV
32
Place RIGHT gable panel primed side up, centered on BV with a 3/4"
overhang on bottom and 1-3/4" overhange on top. Nail using (4) 2" nails.
Place LEFT gable panel primed side up,  ush to right panel on BV with a
3/4" overhang on bottom. Nail using (4) 1-3/4" Nails.
Place BV on  at on  oor as shown.
2
3
You have  nished building your Front wall gable panels.
FINISH
4
BEGIN
1
FRONT WALL GABLE PANELS
PARTS REQUIRED:
x1
x1
1-1/4"
(3,2 cm)
1-1/4"
(3,2 cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)
1-3/4"
(4,4 cm)
2-1/2"
(6,3 cm)
17-1/2"
(44,5 cm)
6"
(15,2 cm)
3/8 x 20 x 48"
(1 x 50,8 x 121,9 cm)
3/8 x 20 x 48"
(1 x 50,8 x 121,9 cm)
Flush
x1
x8
1-1/2" (3,8 cm)
Primed side UP
OFFSET