Instruction Manual
Page 20 of 25
7. Remove center rail bolts from frame. Frame is ready to
be split in two sections.
UNIT STARTUP AFTER
INSTALLATION
1. Lag the frame to the floor.
2. Insure input cold water connection is tight.
3. Ensure output hot water connection is tight.
4. Connect emergency relief valve to drain.
5. Connect steam supply to flange. Check steam pressure
gage and sensor connections.
CAUTION!
Never lift or push in any place but frame of unit.
Damage to piping and or components can occur if
pressure is applied to them.
Outlet