HP MSR2000 Router Series Installation Guide
5
Installation accessories
Pre-installation checklist
Table 5 Pre-installation checklist
Item Re
q
uirements
Result
Installation site Ventilation
• There is a minimum clearance of 10 cm (3.94 in)
around the inlet and outlet air vents for heat
dissipation of the router chassis.
• A good ventilation system is available at the
installation site.
Cage nut (user supplied)Rubber feet (required)
M6 screw
(user supplied)
Mounting brackets (required)M4 screw (required)
Load-bearing screw (required)
Grounding cable
(required)