Installation Guide
25
6. Replace burner (opposite of removal). Ensure burners are
fully seated on burner bracket and are properly aligned.
Replace burner box top. Reconnect wiring.
7. Turn on electric power and gas supply to the furnace.
8. Check furnace for proper operation. Refer to “Operational
Checks” section to verify burner flame characteristics.
B
EFORE
L
EAVING
AN
I
NSTALLATION
• Cycle the furnace with the thermostat at least three times.
Verify cooling and fan only operation.
• Review the Owner’s Manual with the homeowner and
discuss proper furnace operation and maintenance.
• Leave literature packet near furnace.
R
EPAIR
AND
R
EPLACEMENT
P
ARTS
• When ordering any of the listed functional parts, be sure to
provide the furnace model, manufacturing, and serial
numbers with the order.
• Although only functional parts are shown in the parts list,
all sheet metal parts, doors, etc. may be ordered by
description.
• Parts are available from your distributor.
Functional Parts List-
Gas Valve Blower/Collector Box Gasket
Natural Gas Orifice Primary Limit Switch
Propane Gas Orifice Rollout Limit Switch
Burner Auxiliary Limit Switch
Hot Surface Igniter Heat Exchanger
Flame Sensor Door Switch
Gas Manifold Transformer
Ignition Control Blower Wheel
Blower Mounting Bracket Blower Housing
Pressure Switch Blower Cutoff
Pressure Switch Hose Blower Motor
Induced Draft Blower Motor Mount Bracket
Collector Box Capacitor