General Instructions
9
WARRANTY
N
The new equipment is covered by warranty.
The warranty conditions are provided by the distributor.
The manufacturer is not liable for any inaccuracies in this booklet resulting
from printing or transcription errors. The manufacturer reserves the right to
modify its products as it considers necessary or in the interests of the user,
without compromising their essential safety and operating characteristics.
O
INSTALLATION OF ISLAND HOOD
WITH LATTICE-WORK
Step 1
- Identify the desired height (H1=65) for the positioning of the hood.
- Slide the lattice-works (C) and (C1) to the desired height (H2), then block
them with the 8 self-threading screws (V2) (Fig.1a).
- Fasten the lattice-work (C) to the ceiling using the four Ø 8 expansion plugs
and relative screws(V1) (Fig.1b).
- Fasten the upper panel (C2) with 2 self-threading screws (V2).
The two upper screws have already been pre-tightened.
Step 2
- Insert the extension on the flue and fasten them to each other with masking
tape (Fig. 2).
C2
H1
H
H2
Ø8
Ø8
C1
C
V1
V2
C+C1
V3
A
F
D+E
Fig. 1b
Fig. 2
Fig. 1a
- Fasten the flue-extension assembly (D+E) to the lattice-work (C) with the 4 M4
metric screws (V3) inserted in the existing holes without tightening them com-