Specifications
35
1. Required Parts
2. Mounting Work Procedure
1. Remove the duct connection flange from the airconditioner
body.
2. Remove the top plate or the blind plates at both sides, and
fix the plenum chamber securely to the airconditioner body.
3. Place the top plate and blind plates back in position.
3. Cautions on Mounting
When mounting the plenum chamber, in order to maintain the
air flow in the rated volume, replace the motor pulley and
V-belt for standard air conditioner with those included in the
plenum chamber kit.
¡ Pulley and V-belt for replacement
(For only USP8H)
Model
USP8H
USP5H
Part Name
KPC-US8FC
KPC-US5F
Q'ty
1
1
Model
Motor pulley
V-belt
USP8H
A104-19
A-41
1.2 USP5H
USP8H
q Steam heater inlet (3/4B SGP[20A] JIS 5O/F flange)
w Steam heater outlet (3/4B SGP[20A] JIS 5O/F flange)
e Steam spray inlet (1/2B SGP[15A] JIS 5O/F flange)
r Plenum chamber
Notes
qw, or e can be mounted from left side of the body.
q Steam heater inlet (1B SGP[25A] JIS 5O/F flange)
w Steam heater outlet (1B SGP[25A] JIS 5O/F flange)
e Steam spray inlet (3/4B SGP[20A] JIS 5O/F flange)
r Rear duct connection
t Fresh air intake duct connection
Notes
q,w,e or t can be mounted from left side of the body.