Installation Guide
installation
cedar discovery
Second and Subsequent
Courses on Gable End
a. Make new template for angle if
needed.
b. Measure from the left side flange
making sure to stagger the laps by
at least 3 Half-Rounds (Fig. 1).
c. Align left side flange with nearest
alignment line of course below
(Fig. 1).
d. Insert bottom lock into top lock
of course below. Pull up tight
and nail according to “NAILING
PROCEDURES.”
e. For second and subsequent panels,
align left side flange with nearest
alignment line of course below that
allows for proper fit. Insert bottom
lock into top lock of course below.
Pull up tight and nail according to
“NAILING PROCEDURES.”
Final Course on Gable end
Measure width needed at bottom
lock (Fig. 2).
Carefully check alignment of Half-
Rounds to center full or partial
rounds as needed and cut (Fig. 3).
Insert bottom lock of final course
into top lock of course below, pull
panel up tight, and nail at peak using
a color matching trim nail.
Installing Above
Horizontal Siding
Starter strip “CDSS” with drip cap
(Fig. 4).
Overlap at
Least Three
Half-Rounds
Align Side Flange
with Alignment Line
Fig. 1
Measure Width Needed
at Locking Leg and
Cut Using Templates
Fig. 2
Fig. 3
Drip Cap
1/2"
Starter Strip
(CDSS)
Drip Cap
Fig. 4
79