Installation Guide
Acrylic Claw Foot Tub
INSTALLATION INSTRUCTIONS
P 847•244•1234 www.barclayproducts.com
9/7/10
Tools Needed
• Wrench or socket • Drill & Bits •
Anchor Tub to Floor
1. Place tub in intended position on floor.
2. Mark foot anchoring locations on floor with pencil.
3. Move tub to the side to allow work space.
4. Drill starter holes in floor.
5. Put tub back into position.
6. Place flat washers on lag bolts.
7. Put lag bolts through slot in bottom of foot and screw into floor using wrench or socket.
Be sure to re-inforce the floor before securing tub. We recommend 2- 2”x12”‘s securely
fastened to floor beams where you plan to secure your tub.
Parts Recommended
• 2-2”x12” boards • 4 Lag Bolts • 4 Flat Washers