Installation Guide
Page | 1
HIGH DENSITY RECYCLED POLYSTYRENE (RPS)
PANEL MOULDINGS INSTALLATION
TOOLS:
• Measuring tape
• Fine tooth saw & Mitre box or
compound mitre box
• Pencil
• Safety goggles
• Safety mask
• Hammer or finishing nailer
• Putty knife
• Caulking gun
• Paint brushes
• Level
MATERIALS:
• Nails
• Recycled Polystyrene Panel
mouldings
• Locktite® Power Grab® Ultimate
Construction Adhesive or
Liquid Nails Heavy Duty
construction adhesive LN-901
• High quality all Acrylic latex based
paint
• Painter's All-Purpose Acrylic Latex
Caulk
• Clean cloth or sponge
• 220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Recycled Polystyrene (RPS)
Panel mouldings.
WALL AND CEILING PREPARATION
Prior to installing panel mouldings make sure walls are
• dust free
• dry
• grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing American Pro Décor’s Recycled Polystyrene Panel mouldings,
make sure mouldings and adhesives are placed at room temperature 24 hours
before installation. This allows material to adjust to the temperature of the room
to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50° to 95°
Fahrenheit