Installation Guide
Page | 1
POLYURETHANE PILASTER INSTALLATION
TOOLS:
Measuring tape
Fine tooth saw & Mitre box or
compound mitre box
Pencil
Safety goggles
Safety mask
Hammer or finishing nailer
Putty knife
Caulking gun
Paint brushes
Level
MATERIALS:
Nails
Polyurethane Pilasters
Premium Polyurethane
Construction adhesive
High quality all Acrylic latex or oil
based paint
Painters Caulk
Clean cloth or sponge
220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Polyurethane Pilasters.
WALL AND CEILING PREPARATION
Prior to installing Pilasters make sure walls are
dust free
dry
grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing our Pilasters, make sure pilasters and adhesives are placed
at room temperature 24 hours before installation. This allows material to
adjust to the temperature of the room to avoid expansion or
contraction.
The recommended room temperature to install Pilasters is between 50° to
95° Fahrenheit