Service manual

9-60
SPEC
CABLE ROUTING
P Fasten the idling adjusting screw
and oil pressure switch lead with
the plastic band. Install the plas-
tic band with its buckle posi-
tioned towards the rear of the
machine and its end facing to the
right.
Q Route the oil pressure switch
lead under the idling adjusting
screw, making sure that the lead
is not taut.
R Oil pressure switch coupler
S Starter motor
T Oil tank outlet hose
U Oil tank inlet hose
V Throttle body heater outlet hose
W Water pump inlet hose
X To the wire harness
Y Route the water pump outlet
hose and throttle body heater
outlet hose behind the engine
mounting bracket.
Z Coolant temperature sensor
[ Throttle body heater inlet hose
\ Thermostat cover
] To the parking brake
_ To the brake caliper
a Brake hose
b Throttle cable
c Main switch
d Pass the corrugated tube
(engine stop switch lead, throttle
switch lead, right grip warmer
lead, and thumb warmer lead),
corrugated tube (left grip warmer
lead, grip/thumb warmer adjust-
ment switch lead, brake light
switch lead, and headlight beam
switch lead), parking brake
cable, throttle cable, speedome-
ter unit lead, and brake hose with
the holder.