Service manual

4-53
POWR
TR
SLIDE RAIL SUSPENSION
6. Install:
2-up adjusting block
1
(PZ50VT/PZ50MP)
NOTE:
Install the lock lever guide plate
2
as shown in the
illustration so that the projection on the plate con-
tacts the projection
a
on the 2-up adjusting block.
Make sure that the 2-up adjusting block is locked in
place and the end
b
of the lock lever is sticking out
from the sliding frame.
1
2
a
b