Service manual

4-1
POWR
TR
POWER TRAIN
PRIMARY SHEAVE AND DRIVE V-BELT
s
Order Job name/Part name
Qty Remarks
Primary sheave removal
Remove the parts in the order listed below.
Left side cover Refer to COWLINGS in CHAPTER 3.
1V-belt 1
2 Primary sheave assembly 1
For installation, reverse the removal proce-
dure.
2
1
E
60 Nm (6.0 m
kg, 43 ft
lb)
120 Nm (12.0 m
kg, 85 ft
lb)
È:
1st
2nd
È
PRIMARY SHEAVE AND DRIVE V-BELT