Specifications

ENG
R-79
ENGINE DISASSEMBLY
4-7
3. Remove:
• Pressure Plate Bolts ¿ (4 No’s)
• Clutch Springs À ( 4 NO’S)
• Pressure Plate Á with Push rod 1
• Friction Plates à (4 NO’S)
• Clutch Plates  (3 NO’S)
NOTE :
Loosen the Pressure Plate Bolts in a crisscross
pattern.
4. Remove :
• Ball Ä
CLUTCH
NOTE :
The Clutch Assembly can be removed while the
Engine is mounted on the Motorcycle by remov-
ing the following parts and draining the Engine
oil:
• Kick Crank Assy.
1. Remove :
• Nut kick Crank assy.
• Kick Crank Assy.
• Bolts Crankcase Cover-2 (R.H.) ¿ 9 nos
• Crankcase Cover (RH)
NOTE :
• Hold Kick Crank Assy. at extreme down posi-
tion for opening the Nut Kick Crank Assy.
• Loosen the Bolts of Crankcase Cover #2 (RH)
in a crisscross pattern.
2. Remove :
• Gasket ¿
5. Loosen :
• Straighten the Lock Washer tab.
• Nut (clutch boss) ¿
NOTE :
Loosen the Clutch Boss Nut ¿ while holding the
Clutch Boss À with the Clutch Holder.
Clutch Hub Holder
YSST - 233