- Xantrex Photovoltaic Inverter Maintenance Manual

Computer Communications with the PV225S
152607 2–35
e) Fill out the Power Tracking Information requested.
f) Click on the Connections Form Tab to continue.
6. Fill out the Connection - General Information in the form in Figure 2-24.
7. Click on the Telephone Fault Configuration sub-menu to continue.
Figure 2-23
Operational Configuration Screen - Power Tracker
Fill out all the required
information on this
form.
Form Tab
Figure 2-24
Connection Configuration Screen - General
Form Tab
Fill out all the
required
information
on this form.
Sub-menus