Installation Guide

WC-2424-42-SGL
Installation Guide
INSTALLATION INSTRUCTIONS
1
Adjust the feet to level the vanity.
2
Install the counter. Seal around the top of the
cabinet with clear silicone sealant. Do not over
apply. Allow to dry 24 hours for proper curing.