Technical data

SERVICING AND SPARES
6 720 648 547 (2012/06)40
7. GAS VALVE
Isolate gas supply at boiler gas cock.
Pull out air inlet tube (A).
Undo top gas connection (B) to gas valve.
Undo bottom gas connection (C) to gas valve.
Undo two securing screws (D)on the underside of casing.
Pull valve up and forward out of boiler.
Disconnect electrical connections.
Replace valve with new seals and check for gas soundness.
Fig. 61 Gas valve removal
8. SYPHON/CONDENSATE TRAP
1. Pull condensate pipe out of the adaptor.
2. Remove trap from boiler.
Clean trap and check that the connection to the heat exchanger is
clear.
Fill the condensate trap with approximately 1/4 litre of water and refit
in reverse order.
Fig. 62 Syphon removal
9. ACCESS TO BOILER CONTROL COMPONENTS
Remove 3 screws (A) and remove cover from control.
10. PCB FUSE
Remove fuse (B) from the PCB and replace.
There is a spare fuse clipped into the cover.
Fig. 63 Component and fuse access
The valve will require setting, follow procedure “Setting
the gas/air ratio” in the gas conversion section.
6720648547-30.2Wo
7.
A
C
B
6720647361-31.2Wo
6720647361-35.2Wo
A
B
9.
10.