Owner`s manual
Installing and Operating Your Blower Accessory
25
Service and Orders – 25
Floor Base 4287 and 4288
1. Lay heater on its back. Loosen two (2) screws, located on bottom of heater - Do Not Remove Screws.
2. Attach floor base to heater with two (2) keyholes located on top of the floor base. Tighten screws. Use two (2) screws, included
with kit, to attach back of floor base to the bottom back of the heater.
3. Stand the heater upright. Select the location of heater.
Refer to page 8 for minimum clearances.
4. Connect gas piping. See page 10 for gas supply and
piping instruction.
5. Use two (2) floor mounting screws, depending on your
floor construction, to mount the bottom back of the floor
base to the floor.