Installation Manual

Monitoring Platform
Themonitoringplatformenablesmonitoringthetechnicalandfinancialperformanceofoneormore
SolarEdgesites.Itprovidespastandpresentinformationonthesystemperformancebothatthesystem
andmodulelevels.
Supported ACGrids
ThefollowingfiguresillustrategridsthataresupportedbySolarEdgesinglephaseinverters.Referto
CountryandGridonpage41).
Groundconnectionisrequiredforallgrids,asdescribedinConnectingtheACGridtotheSafetySwitchon
page29.
NotethatinsomecasesL1andL2arenotinterchangeable.Intheseplaces,L1andL2locationsappearin
thedrawing.
Figure 2: 240V AC grids supported by SolarEdge single phase inverter
Figure 3: 208V AC grids supported by SolarEdge single phase inverter
1
1
208V AC grids are only supported by some inverter models. Refer to the specification supplied with the inverter.
Chapter 1: Introducing the SolarEdge Power Harvesting System