User's Manual
14
COMPONENT SCHEMATIC TESTING PROCEDURE RESULTS
Timer Motor
Timer
Dispenser Mechanism
1. Disconnect the Wiring harness
connector from the timer assembly.
2. Set VOM meter on the Rx1 scale.
3. Measure resistance between timer
motor terminals.
1. Disconnect the wiring harness
connector from the timer assembly.
2. Set VOM meter on the Rx1 scale.
3. Connect one probe to contact 31.
(Tan)
4. Connect the other probe to the timer
contact to be tested.
5. Manually advance the timer until the
contact closes.
6. Manually advance the timer until the
contact opens.
1. Remove the front door panel.
2. Remove the drip cover.
3. Latch the detergent door closed.
4. Manually advance the timer through a
complete cycle slowly.
1. Meter should read 1800 - 3000Ω.
1. Contact CLOSED - meter should
read 0Ω.
2. Contact OPEN - meter should
read º (infinity).
1. At 12 o’clock position - Draw bars
will move upward causing the
detergent actuator assembly to
release the latch and detergent
cup should open.
2. At 4 o’clock position - Draw bars
will again move upward causing
the wetting agent actuator to
release wetting agent.
3. From the 6 o’clock position to the
8 o’clock position the draw bars
are driven down to reset the
mechanism.