Instruction for Use

GB4
Check whether the exhaust pipe and clamps are provided. If not, they must be purchased separately.
Note: Parts marked with the symbol “(*)” are optional accessories supplied only with some models or parts not supplied, to be purchased
separately.
Pre-assemble the steam deflector on the motor assembly:
(a.) fit the steam deflector to the motor assembly, (b.) secure with 2 M6 x 20 screws and 2 Ø 14 x 12 bushings.
Pre-assembly of the electrical connection box:
(c.) remove the screws and washers on the extractor unit and remove the adhesive tape fixing the box to the extractor unit,
(d.) position the electrical connection box above the extractor unit, (e.) secure with 2 Ø 3.5 x 9.5 screws and 2 Ø 14 x 12 washers (previously removed).
1. Using a pencil, draw the centre line on the wall up to the ceiling to facilitate installation operations.
2. Apply the drilling template to the wall: Align the vertical centre-line on the drilling template with the centre-line drawn on the wall. The template’s bottom
edge represents the bottom edge of the hood.
3. Drill as shown on the template, insert the wall plugs and screw in the top 2 screws, leaving a space of approx. 1 cm between the screw head and the wall.
Note: Drill all the holes indicated on the template: the top 2 holes are for hanging the hood and the bottom hole is for fixing it securely to the wall.
4. Fit the flue support bracket G to the wall and against the ceiling, use the support bracket as hole diagram (the small slot on the support must match the
line drawn on the wall - step 1) and mark 2 holes with the pencil, drill the holes (Ø 8 mm), and finally insert 2 plugs.
5. Fix the flue support bracket to the wall with 2 screws.
6. Hang the hood on the 2 top screws.
7. Screw in the bottom screw (and washer!) to fix the hood securely in place (COMPULSORY!!).
After checking the alignment of the hood, TIGHTEN ALL THE SCREWS - top and bottom.
Note: the bottom fixing, positioned in the centre, is visible upon removal of the grease filter and the carbon filter frame (if present).
8. Connect an exhaust pipe (pipe and clamps are not supplied and must be bought separately) to the collar B located above the extraction motor unit.
For extractor operation, connect the other end of the exhaust pipe to the home discharge device.
For filter operation, fix the deflector F to the flue support bracket G and connect the other end of the exhaust pipe to the deflector collar F.
9. Make all necessary electrical connections.
10. Fit the flues over the extractor unit, engaging them in their seat above the hood.
11. Slide the top section of the flue and secure it with 2 screws (11a) to the flue support bracket G (11b).
Refit the carbon filter frame and the grease filter/s and check for correct hood operation.
EXTRACTOR OR FILTERING HOOD INSTALLATION