F6 0008 IG
BEFORE YOU BEGIN
1) Shut off water supply.
2) Carefully inspect waste and supply tubing for signs of damage.
3) Replace waste or supply tubing if necessary
TOOLS AND MATERIALS
INSTRUCTIONS
1) Apply tape or putty to both ends of hot and cold supply
nipples (9). Thread the nipples into risers (8).
2) Attach the rubber washer into riser nut (8), connect it with
adapter riser (7).
3) Attach the rubber washer into adapter riser nut (7), connect it
with faucet body (5).
4) Set the faucet onto tub and nipples go through the tub wall
holes.
5) Slid the metal washer (10) and install the lock nut (11) then
tighten with wrench.
6) Set the handles (6) on faucet body with screws.
7) Attach the rubber washer into cradle nut (4), connect it with
faucet body.
8) Assemble the hand shower (1) (2) and hose (3) with rubber
washer, then to connect with cradle.
9) Connect the water supply lines to riser nipples.
10) Turn on main water supply and check all connections for
leaking.
COMPLETE INSTALLATION
Note: All nuts connections, hand tighten first then quarter turn
tighten by wrench. Don’t over tighten the nut.
MODEL: F6-0008
TUB FAUCET INSTALLATION GUIDE
Porcelain Lever
Metal Lever
Porcelain Cross
Metal Cross