CM7629Q / CK / EK Rev : 17-08-11
8 1-3/16" #B
1. Insert 2 dowels (#F) into each end of the leg support (#3), and the other ends of the dowels into the right and left H/board legs (#2). 2. Prepare 2 bolt assemblies by applying a lock washer (#B) onto the bolt (#A) then a flat washer (#C) onto that same bolt (#A). Insert a bolt assembly into each end of the leg support (#3) and secure using the Allen wrench (#D).
1. Prepare 6 bolt assemblies by applying a lock washer (#C) onto the bolt (#A) then a flat washer (#D) onto that same bolt (#A). 2. Carefully place the headboard (#1) onto the top of the H/board legs (#2). Insert 4 bolt assemblies into each end of the legs (#2) and secure using the Allen wrench (#D). #D #B x 6 pcs #B 1. Insert 2 threaded studs (#F) into the holes along the sides of the headboard (#1) and footboard (#4). Turn right to tighten. #F 2.
Insert the threaded ends of the slat supports (#8) into the holes along the slat center (#7). Turn right to tighten. 1. Apply the slats (#6) onto the side rails (#5). 2. Turn the slat support legs (#8) along the center to the right. This will connect the slat center (#7) to the slats (#6). #J x 8 pcs 3. Insert a screw (#J) into the ends of the slats (#6). Secure using the Phillips screwdriver.