Drain Pump - DPFGIM - Installation Instructions

16. Remove two screws holding freezing compartment brace to cabinet, lift brace up.
17. Lift evaporator platen up and tilt back enough for bin assembly to clear the base.
18. Remove air baffle.
19. Unplug 7 wire harness connector (at back of
bin).
20. Remove 1 screw at each corner of the base.
21. Lift bin assembly off the base.
Note: Prop evaporator assembly up. A 3' length of 3/4" PVC tubing with one end inserted into
the cup mold and the other against the base will hold it up.
3
Air Baffle
Brace
Chassis Shown in Front of Bin Assembly