OVERHEAD GARAGE RACK ASSEMBLY INSTRUCTION MANUAL
OVERHEAD GARAGE RACK NEED HELP? CONTACT US! Have product questions? Need technical support? Please feel free to contact us: CustomerService@vevor.com This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
1X 2X WARNINGS -Install into Wood Joists only -Distribute weight evenly -Opposite ends may come loose when installing side beams -Objects can fall off the rack after being loaded Tools Required (Not Included) 02
WARNING THIS IS A DO IT YOURSELF (DIY) PROJECT. DO NOT ATTEMPT THIS INSTALLATION WITHOUT A BASIC UNDERSTANDING OF THE CONTENTS IN THESE ASSEMBLY INSTRUCTION. IF YOU ARE NOT CONFIDENT WITH LOCATING AND ANCHORING THE STORAGE RACK TO THE CEILING JOISTS, DO NOT ATTEMPT THIS INSTALLATION WITHOUT SOMEONE WHO IS.
COMPONETS 4ft x 8ft Unit: 8 Vertical Posts 2 Side Beams 4/2 C Channel Beams 3 Center Supports 4 Ceiling Brackets 4 Wire Decking Units 4 Diagonal Brace 1 ceiling drilling positioning paper 1 Hardware Bag 4 Hooks 4ft x 6ft Unit: 8 Vertical Posts 2 Side Beams 4/2 C Channel Beams 2 Center Supports 4 Ceiling Brackets 3 Wire Decking Units 4 Diagonal Brace 1 ceiling drilling positioning paper 1 Hardware Bag 2 Hooks 3ft x 8ft Unit: 8 Vertical Posts 2 Side Beams 4/2 C Channel Beams 3 Center Supports 4 Ceiling Brac
Hex Bolt M8x16 Lag Bolt St8.
Pre-Assenbly Completing the following 1~3 steps to assemble the long C Channel beam. 2pcs connecting beam design needed only! The whole beam design can ignore the assembly steps on this page. Step 1, Align the holes at the center of the 2pcs C Channel beams as seen in the illustration (8ft size only). Step 2, Using 4pcs M6x16 Hex bolts, 4pcs Hex nut and 4pcs Washer, assemble the C Channel beam together on the outermost Holes as seen in the following picture.
Assenbly To punch holes on the ceiling more quickly and accurately, we have thoughtfully designed the ceiling drilling positioning paper(included in the package). If necessary, please follow the steps below: 1. First, find the beam position on the ceiling, stick one of the long beam positioning paper on the ceiling with double-sided tape, ensure that the two black lines at both ends are on the beam or across the two beams, and the positioning paper is not bent or sagging. 2.
3. Next, align the two ends of the last long beam positioning paper with the edge of the short beam positioning paper respectively, and stick it on the ceiling parallel to the first long beam positioning paper.
4. After pasting, drill holes on the black lines at both ends of the long beam positioning paper. 1) make sure the hole is punched on the beam. 2) There are 2 holes at both ends of each long beam positioning paper, a total of 4 holes. 3) Two holes at each end of the long beam positioning paper, one for each with the red line as the center, and the spacing is about 20 inches. 5. Finally, all the holes are finished, install the ceiling bracket before installing the column.
6. Adjust the length of the Vertical Post to the desired distance from the ceiling. Ensure the lower section of the vertical post is placed on the inside of the two post pieces. All posts are adjusted to the exact same length. Secure the post together using 2pcs Hex Bolt M8x16, 2pcs Hex Nut and 4pcs Washer. Make sure one bolt and nut assembly on each face of the vertical posts. ( As following drawing B) Repeat this step for the remaining posts.
ALWAYS install the vertical posts between the Lag screws in the ceiling bracket. DO NOT attach the vertical posts outside of the lag screws in cantilevered fashion. WARNING If you install the ceiling bracket & vertical posts as the left drawing, the ceiling brackets will bend, causing your storage items to fall to the floor.
7. Place the rivets of the Side beams in the bottom 2 holes of the vertical posts. Ensure the side beams are on the inside of the vertical posts. Use a rubber mallet to hammer the rivets into the bottom of the teardrop holes. 8. Finish with installation of the other left Beams. WARNING: Opposite ends may come loose when hammering beams into place.
9. A: Connect Center support to C channel beams by using 2pcs Hex Bolt M6xl6, 2pcs Hex Nut and 2pcs Washer. Repeat this step to the opposite of Center support (4pcs C Channel beam design only). *Fully tighten the bolts. B: Place the center support to the rivets on C channel beam. Hammer it gently to the top of the teardrop holes on the center support.
*Once the center support is installed, go back and tighten the vertical posts to the ceiling brackets. 10. Install and fix the two ends of the diagonal brace on the holes of the ceiling bracket and the vertical post respectively (as seen in the picture). There are 4 diagonal braces in total. Installation requirements: 1) The angle between the diagonal brace and the ceiling bracket should be as close as possible to 45°. 2) It is recommended to install the diagonal brace on the outside of the rack.
11. Take the Wire Decking unit and place them on the rack one by one. *Look at the ceiling brackets and Lag screws to make sure that they have not pulled out during the beam seating process. If they have, it is an indication that the Lag screws may not be in the center of the ceiling joist, or that they were not fully tightened when installed. *Finally, check all the Nut and bolt connections on the vertical posts and ceiling brackets to ensure that everything is tight.
E-mail: CustomerService@vevor.com Manufacturer: QINGDAO SHUNXINYI METAL PRODUCTS CO.,LTD. ADDRESS: No.
E-mail: CustomerService@vevor.