Installation Guide

GREENWAY P100:
INSTALLATION INSTRUCTIONS
FOR SLOPES AND RETAINING WALLS
Video installation guide available on our YouTube channel.
Please read through all instructions before beginning.
DESIGN LAYOUT & SITE PREPARATION
Once you have determined where your wall needs to be placed, dig a trench for
your base course 8-10 inches deep (6 inches for the buried blocks, and an
additional 2-4 inches below that for your base rock or sand).
BASE COURSE
Fill the bottom 2-4 inches of your trench with crushed rock or sand that can be
easily compacted with a tamper or similar tool.
Compact the crushed rock or sand, then top with an inch or two of sand to help
with leveling as you place the block. (see details for drainpipe placement if
desired)
P100 PLACEMENT & LEVELLING
If using the side rails, snap both into receptors slots and secure them before setting
block.
Place Side Rail in marked receptor on blocks, press until the tabs snap into the
receptors.
Place your first row of block 9 inches apart. (each side rail can also serve as a 9” spacing
gauge)
Level each block front to back and side to side.
If the blocks are not quite level, lift the blocks to push some sand underneath or tap high end into base sand, and adjust to
level. See Fig. 4
Continue levelling along the line from one end of the wall to the other. Pin the blocks in place with a wire sod staple to
prevent kicking it out of positions (optional).
Tip: For best results, use longest level possible