Installation Guide

RAMPART WALL - Total Wall Surround Installation
5701 NW 35th Ave. Miami, FL 33142 • 1-877-360-4454 • www.UNIVERSALTUBS.com
INSTALLATION
CORNER CADDIES
Before starting work with the corner units please make sure the silicon, adhesive and caulking used on the
back wall and both flanking walls have been allowed enough time to properly cure.
Additionally please make sure the tub deck area and corners where each wall panel meets is clear of any
debris and dirt. If cleaning is necessary make sure the area is thoroughly dried off before continuing.
Once ready begin to place adhesive strips along the back to back side of the corner unit. If necessary fold the
adhesive strips.
Once the adhesive strips have been placed begin to apply the silicone, generously, along the corner unit’s
sides. Applying silicon along the middle or spine of the corner unit is not necessary.
Prepare to place the corn unit and firmly push onto the unit to ensure even connection between the back of
the corner unit and the face of the back wall and flacking wall. Firmly press onto the corner unit’s edges as
you apply a bead of caulking along the edge to finish the seal.
Rear view of Back Wall Panel
Example 60 by 60 in.
Rear view of one Flancking Panel
Rear view of
Corner Panel
Example 30 by 60 in. cut