Instructions / Assembly

08/12
B
A
A. Typical Endlap Detail B. Typical Eave Detail
END LAP
TAPE SEALER
PURLI
N
ROOF
PANEL
1/4-14X 1
SELF DRILLER
N
I
M
6
SIDELAP FASTENER *
WASHERED
FASTENER
ROOF
SHEE
T
BEAD MASTI
C
/CAULKING
EAVE
PURLI
N
OUTSIDE
CLOSURE
EAVE
FLASHIN
G
INSID
E
CLOSURE
1
U
G
/
W
T
T
R
E
2
A
M
U
G
O
/W
X
T
T
R
E
P
S
N
I
L
R
U
P
C
A
E
P
S
N
I
L
R
U
P
C
A
E
2
/
1
P
S
C
A
E
/
1
2
P
S
C
A
E
/
1
2
P
S
C
A
E
/
1
2
P
S
A
E
C
/
1
2
P
S
C
A
E
G
R
I
T
P
S
C
A
E
/
1
2
P
S
C
A
E
P
A
L
E
D
I
S
P
A
L
E
D
I
S
SIDELAP FASTENER *
1/4 - 14 X 1 TE K
14 X 7/8 #
1
*
SHEET LAPPING DETAILS
*
An intermediate fastener is required at the sidelap when fastener spacing
at sidelap
exceeds 3’-0”.
Application and design details are for illustration purposes only, and may not be appropriate for all environmental conditions or
building designs. Projects should be engineered to conform to applicable building codes, regulations, and accepted industry practices.
SHEET LAYING DETAILS
(
She
d Roof Style)
STEP
:
1. Square the building according to accepted building practices.
2. The substructure (ridge to eave) must be on plane (
±
1/4”-20’
).
3.
Peak (ridge) purlin spacing is approximately 12” maximum (6”
fr
om centerline of building).
4. Roof panels s
hould be installed in the longest lengths available
to eliminate endlapping.
5. Where single length sheets are impractical, e
ndlaped sheets
must be installed similar to illustrated sequence with l
ower
panels installed before upper
sl
ope panels.
6. Lower slope panels must be installed square to en
sure that upper
slope panels will ne
st properly at endlaps.
7. Roof should be swept clean
of any
drill shavings at the end of
each days work since shavings
will rust quickly and
discolor the
panel fi nish.
METAL ROOFING
INSTALLATION INSTRUCTIONS
* Overhang is desirable if gable fl ashing is not used.
Phone 808-682-3000 or Neighbor Islands 800-352-3920 • Fax 808-682-3636
91-104 Kalaeloa Blvd, Kapolei, HI 96707 • www.kloecknermetals.com

Summary of content (3 pages)