2FT Climbing Dome USER AND ASSEMBLY MANUAL WARNINGS! TOY MUST BE ASSEMBLED BY AN ADULT BEFORE USE. CHILDREN MUST NOT USE THIS PRODUCT UNTIL PROPERLY INSTALLED. THIS PRODUCT CONTAINS SMALL PARTS AND IS NOT SUITABLE FOR CHILDREN UNDER 36 MONTHS UNTIL FULLY ASSEMBLED. REMOVE ALL PACKAGING BEFORE GIVING TO YOUR CHILDREN. RETAIN PACKAGING FOR FUTURE REFERENCE. KEEP AWAY FROM FIRE.
PLEASE DO NOT RETURN TO STORE STOP Please do not return this product to the retailer!! We are able to assist you in ANY way If you find that you have any trouble with assembly or missing or damaged parts please contact the seller.
BEFORE ASSEMBLY Check the entire box and all packing material for parts and/or additional instruction material. Read the instructions and identify all parts and hardware using the parts list. Test fit all bolts by inserting them into their respective holes. Do not scrape away all of the powder coating. Bare metal may rust. SAFETY INSTRUCTIONS FAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID WARRANTY.
**IMPORTANT SAFETY INFORMATION** PLEASE READ BEFORE ASSEMBLY: INSTALLATION & GROUND PREPARATION INSTRUCTIONS: • Place the equipment on a level, well-drained ground, not less than 6.6 ft (2.0 m) from any structure or obstruction such as a fence, garage, house, overhanging branches, laundry lines, or electrical wires. • Provide enough room so that children can use the equipment safely. For example, for structures with multiple play activities, a slide should not be placed in front of a swing.
NOTE: An initial fill level of 12 inches (30 cm) will compress to about a 9inch (23 cs) depth of surfacing over time. The surfacing will also compact, displace, and settle, and should be periodically refilled to maintain at least a 9-inch (23 cm) depth. Use a minimum of 6 inches (15 cm) of protective surfacing for play equipment less than 4 feet (122 cm) in height. If maintained properly, this should be adequate.
Placements • Proper placement and maintenance of protective surfacing is essential. Be sure to: extend surfacing at least 6.6 feet (2 m) from the equipment in all directions. • For to-fro swings, extend protective surfacing in front of and behind the swing to a distance equal to twice the height of the top bar from which the swing is suspended. For tire swings, extend surfacing in a circle whose radius is equal to the height of the suspending chain or rope, plus 6.6 feet (2 m) in all directions.
SAFE PLAY AREA SAFETY ZONE - Place the equipment no less than 6.6 ft from any structure or obstruction such as a fence, garage, house, overhanging branches, laundry lines, or electrical wires. The impact surfacing needs to cover the entire recommended play area. Refer to the example below.
ASSEMBLY Step 1 Lay out 10 Green Tubes (#A) and form a decagon as illustrated below.
Step 2p2 Slide an M8 Washer(#H) over φ1 0 x 25mm Bolt(#F), then slide the Bolt(#F) through the joint of 2pcs Green Tubes(#A) on the ground, 1pc Yellow Tube(#B) and 1pc Green Left Gate Tube(#N) in the order indicated by the numbers. Slide another M8 Washer(#H) over the Bolt(#F) and secure with an M8 Nylon Nut(#G). Hold the nut with a wrench while tightening the Bolt.
Step 3p 3 Attach a Yellow Tube(#B) and the Green Right Gate Tube(#O) to the bottom joint in the right, slide a φ1 0 x 25mm Bolt(#F) through an M8 Washer(#H), the four tubes (in the same order indicated above), another M8 Washer(#H) and an M8 Nylon Nut(#G). Repeat the same step to attach a Yellow Tube(#B) and a Green Tube(#A) to the next joint, and secure with 1pc φ10 x 25mm Bolt(#F), 2 pcs M8 Washer(#H) and 1pc M8 Nylon Nut(#G). Repeat until you have assembled all 10 joints in the bottom.
Now let's start the second circle! Step 4 4 Attach 3 Yellow Tubes(#B) to the yellow joint in bottom circle, secure with 1pc M8 x 40mm Bolt(#E), 1pc M8 Washer (#H) and 1pc M8 Nut (#K). Make sure the five yellow tubes are placed in an anti-clockwise direction, in the order indicated by the numbers. Note: The bolt goes through from inside out, with the head of the bolt on the inside.
Step 5 5 Then, next to the joint we just assembled, add 2pcs Green Tubes(#A), 1 Yellow Tube(#B) in the order indicated by the numbers. Secure the joint with 1pc M8 x 40mm Bolt(#E), 1pc M8 Washer(H) and 1pc M8 Nut(#K). Note: The bolt goes through from inside out, with the head of the bolt on the inside.
Step 6 Repeat the previous steps and assemble the second circle as illustrated below.
Step 77 Now let's start assembling the third circle. Add 2pcs Green Tubes with Silver Mark(#M), 1 Yellow Tube(#B) to the joint as shown in picture, and make sure all 6 tubes are placed in the order indicated by the numbers. Secure the joint with 1pc M8 x 40mm Bolt(#E), 1pc M8 Washer(H) and 1pc M8 Nut(#K). Note: The bolt goes through from inside out, with the head of the bolt on the inside.
Step 8 Secure the joint on top with 1pc M8 x 40mm Bolt(#E), 1pc M8 Washer(H) and 1pc M8 Nut(#K). Make sure the 5pcs Yellow Tubes(#B) are placed in the order indicated by the numbers. Note: The bolt goes through from inside out, with the head of the bolt on the inside.
Step 99 Install the Climbing Grips(#C) with M8 x 25mm Nut(#D) to cover the the bolt on each of the joint (except the bottom joints touching the ground). Please make sure the notch of the grip is between the first and the last tube.