Instructions / Assembly

340 Snyder Avenue, Berkeley Heights, NJ 07922
Tech Support: 908-464-1094, 1pm 5 pm ET
www.micromark.com
#84630 MICROLUX
TM
MILLING MACHINE ASSEMBLY INSTRUCTIONS
Attach the fuselage/column to the base
with big washer and lock nut. Tighten
the lock nut securely.
1
Install limit block and its wedge (gib) to the
fuselage/column. Position it about half-way
down the fuselage/column and snug the
lock handle. There is no need to overtighten
this handle as damage to the wedge could
occur. Top cover (#75 on parts diagram)
must be glued to top of column.
2
Install head stock and its wedge (gib) to
the fuselage/column. Parts #46 and #51
are mounted at this time. (See Vertical Z
Axis parts diagram in the manual.) Head is
heavy and two people might be required
for alignment and installation. It is also
best to fit the gib in contact with the
screws slightly, as well as, unlocking the
feed hub into its ‘normal feed’ position
(see label on side of head). Also, the head
lock handle should be loosened. Now
install and engage rack with head gear.
3
See the instruction manual for wedge (gib)
adjustment procedure and attach one
handle as shown to move head up and
down to check adjustment.
4
5
From the top, insert drawbar through
spindle while inserting chuck mandrel
assembly from below. IMPORTANT: The
notch in the R8 mandrel you are inserting
must be mated with the pin up inside the
spindle!
6
7
Install spring support to left side of column
with 3 screws.
8
Your MicroLux milling machine was assembled and tested at the factory, but was disassembled for safe shipment.
A
ssembly is not difficult, but care should be taken to follow these instructions in the proper sequence to assure safe and
successful operation of the machine. We assume you already have the usual assortment of shop tools, such as
wrenches, screw drivers, pliers and hex keys, needed to assemble small machinery.
Before starting the assembly sequence, carefully unpack and clean all machine elements. For proper part identification
and location, it will be most helpful to study the Assembly and Parts diagram included in the Instruction Manual.
Assembly Procedure:
Install remaining operating levers to
handle stock of spindle shaft (pinion).
Thread drawbar until seated and tighten
with spanner and open-end wrench.

Summary of content (3 pages)