These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional, and to
check with your local building inspector or building permit office for approvals and possible variations that may apply.
SIDING STARTER STRIP #3.5GSS
INSTALLATION GUIDELINES
1. ESTABLISH CHALK LINE
Establish a chalk line in relation to the windows and eave after determining the lowest corner of the house. Partially drive a nail 1" above
the lowest point and snap a level chalk line from this nail to a similar nail at the next corner. Repeat same procedure around house.
When installing siding leave a minimum of 6" clearance from soil grade or 2" from a hard surface such as steps, driveways and decking
products. Flashing and counter flashing is required at roof/wall junctures, in accordance with the roofing manufacturers instructions. Siding
must be installed with a minimum 2" clearance from roofing or as per the local building code.
2. INSTALL STARTER STRIP
Align the top of starter strip on the chalk line. Nail the starter strip with corrosion resistant fasteners 12" o.c., snug-not-tight. When using
backerboard insulation or insulated sheathing behind siding, fur out the starter strip to accommodate the additional thickness. At a
minimum, a weather resistant barrier or housewrap should be installed over wood fiber wall sheathing.
Chalk Line
Starter Strip
2
1
4 ¼ in.
10.8 cm
4 ¼ in.
10.8 cm
1 in.
2.54 cm