Instructions / Assembly

6' PRE-ASSEMBLED RAIL WITH ALUMINUM
BALUSTERS INSTALLATION INSTRUCTIONS
Measure the distance between posts and cut the rails to size. For
even spacing between the balusters and posts, be sure to cut
from both ends of the rail.
Attach the rail by using the (4) - 2x4 railing brackets (sold sepa-
rately) as shown in fig. 1. An alternative for decorative applications
would be to toe-nail (4) - #8-3" decks screws (sold separately)
through the side of the rails and into the posts.
Fasten a support block (sold separately) at the center of the
bottom rail to the deck surface for spans greater than three feet
(fig. 2).
Once the rail has been securely fastened, cut the bands.
Tools Needed
2x4 railing brackets
or #8 – 3" deck screws
Drill/power screwdriver
Miter or circular saw
with carbide tip blade
Tape measure
Carpenter’s level
Carpenter’s pencil
Safety glasses/goggles
• Gloves
Step 1
Step 2
This brochure is for illustration purposes only. Use of this product must be in accordance with all local zoning and/or building codes. Consumer assumes all risks and liability associated with the use of this product.
For details on safe handling, go to UFPI.com/ptinfo. Warrantor does not provide any warranty, either express or implied, and shall not be liable for any damages, including consequential damages.
©2014 Universal Forest Products, Inc. All rights reserved. Assembled in the USA with imported balusters.
2801 East Beltline NE, Grand Rapids, MI 49525 616.365.4201 8297_4/15
www.ufpi.com
Step 3
Step 4
fig. 1
NOTE: DO NOT CUT THE BANDS until the rail has been securely
installed between the posts. The top and bottom rails are held
together by the bands.
Fig1aWS.pdf
Fig3aWS.pdf
fig. 2

Summary of content (2 pages)