Installation Sheet

4
ENGLISH
INSTALLATION PROCEDURE - Faucet
1. Place gaskets under spout.
Pass the supply hoses and
mounting studs through the
mounting holes until the spout
comes to rest.
2. Orient the spout as needed. From
below the mounting surface, place
the crescent shaped washer over the
mounting studs as shown.
Fasten the mounting nuts to the studs
to secure the spout.
Tighten with wrench as needed.
Connect the hoses to the supply lines.
The left hose (marked with red band)
connects to the hot water supply.
The right hose connects to the cold
water supply.
Tighten with wrench as needed.
3. Insert the drain lift rod through the
opening in the back of spout.
Drain Lift Rod
Gaskets
Spout
Supply Hoses
Mounting Studs
Mounting Nuts
Washer