Operator's Manual

Installation
5
Mower Preparation
Remove Recycler
Baffles
1. Tilt mower into the vertical position, refer to;
Tilting the Mower, page 13.
2. Remove locknuts, carriage bolts and the
Recycler
baffles from the mower (Fig. 1).
Note: Save all hardware for use when
installing Recycler
baffles.
1
m-3562
2
3
Figure 1
1. Recycler
baffle
2. Carriage bolt
3. Locknut
Install Bagger and Discharge Baffles,
Chute Latch and Spring
1. Locate the left and right bagger baffles inside the
mower and secure with (6) 5/16–18 x 3/4”
(19 mm) carriage bolts, through from the bottom
of mower, and (6) 5/16” locknuts (Fig. 2).
2. Locate the left and right discharge baffles inside
the mower and secure with (4) 5/16–18 x 3/4”
(19 mm) carriage bolts, through from the bottom
and inside of mower, and (4) 5/16”
locknut.(Fig. 2).
3. Mount latch on chute and hold against rear of
mower. If holes are not drilled, mark, center
punch and drill two 17/64” (7mm) holes in
mower for latch.
4. Locate the latch on top of the mower and secure
with (2) 10–24 x 1/2” (13 mm) screws, through
from the bottom of mower, and (2) 10–24
locknut (Fig. 2).
5
1
6
3
m-3544
7
2
4
3
2
4
Figure 2
1. Bagger baffle
2. Locknut 3/8”
3. Carriage bolt
5/16–18 x 3/4” (19 mm)
4. Discharge baffle
5. Latch
6. Screw 10–24 x 1/2”
(13 mm)
7. Locknut 10–24
5. Attach spring bracket below traction unit control
plate with existing rear center bolt, down from
the top, and locknut (Fig. 3). Hook chute spring
into bracket
3
m-3563
1
4
2
Figure 3
1. Spring bracket
2. Existing bolt
3. Existing locknut
4. Spring