Installation Instructions

ProcedureDescription
Qty.
Use
Pulleyassembly1
Shoulderbolt
1
Flangenut(5/16inch)
1
8
Metalbeltcover1
Installthepulleyassemblyandshoulder
bolt.
Blowerassembly1
Baggerbelt1
Spring
1
9
Plasticbeltcover1
Installtheblowerassembly,baggerbelt,
spring,andplasticbeltcover.
1
PreparingtheMower
NoPartsRequired
Procedure
Performthefollowingproceduretopreparethemowerfor
attachingtheblowerandnishingkit.
1.DisengagethePTO,movethemotioncontrolleversto
theneutrallockedposition,andsettheparkingbrake.
2.Stoptheengine,removethekey,andwaitforallmoving
partstostopbeforeleavingtheoperatingposition.
3.Repairallbentordamagedareasofthemowerdeck
andreplaceanymissingparts.
4.Cleanthemowerofanydebrisonthedeckorrearpart
ofthemowertoeaseinstallation.
2
RemovingtheExistingBelt
CoverandtheDischarge
Chute
NoPartsRequired
Procedure
Note:Cleantheareaaroundthebeltcoverbeforeremoving
it.
1.Lowerthemowerdecktothelowestheight-of-cut
position.
2.Loosentheright-hand,belt-coverbolts(Figure1).
Note:Forthe60inchmower-deckbeltcover,the
boltswillneedtoberemoved.
3.Removetheright-handbeltcover.
4.Removefastenerssecuringthedeectorassemblyand
existingcutoffbafetothedeck(Figure1).Retainall
fasteners.
5.For54inchmowerdecksonly,removethefasteners
pluggingtheforwardhole.(Figure1).
G020960
1
5
3
4
5
6
3
2
2
7
Figure1
1.Deectorassembly5.Locknut(existing)
2.Fasteners(existing),retain6.Forwardhole(54inch
mowerdecksonly)
3.Carriagebolt(existing)
7.Beltcover
4.Cutoffbafe(existing)
6.Storetherighthandbeltcoverandthedischargechute
forlateruse.Installthemwhenthebagger,blower,
andthepulleyareremoved.
2