Service Manual
5-40
Digital Edition - TITAN® HD Service Manual
January 2018
Table of Contents
CHASSIS
MyRide Replacement (Cont.)
Installation
1. With the seat and sub-frame assembly attached to the overhead lift, lower the seat into the machine, leaving
room under the seat.
2. Connect the seat switch.
3. Lower the seat and sub-frame assembly to align the trailing arm with the mount holes in the ROPS tube (Figure
47).
4. Install the two shoulder bolts securing the trailing arm to the lower ROPS tubes. Torque to 37 ± 3 ft-lbs. (50
Nm).
5. Route the two cables back into the cable retainer and fasten (Figure 48).
Figure 47
Figure 48