Service Manual

ZT-2100 51
If the unit has been torn down completely, the
following summary identies the assembly pro-
cedures necessary to completely assemble the
unit. Each assembly procedure is located by a
page reference.
The part reference numbers provided in each
assembly procedure are keyed to the individual
exploded views, and are also keyed to the com-
plete unit exploded view on page 30.
1. Install the hydraulic components. See
pages 46-50.
2. Install the input shaft and bypass rod. See
page 45.
3. Install the axle shaft and reduction gears.
See page 43.
4. Install the cog brake and side cover. See
pages 41-42.
5. Install new seals. Page 40.
5. Fill the transaxle with new oil. See page
11.
6. Install the bypass arm and control arm.
See page 39.
7. Install the transaxle onto the vehicle.
8. Perform the purge procedures listed on
page 12.
ASSEMBLY AFTER A COMPLETE TEARDOWN