Service Manual

MOWER DECKS
6-17Toro Z Master G3 3000/5000/6000 Series Service Manual
6
4. Lift and remove the oor pan. With a 3/8” ratchet
or breaker bar in the square hole for the idler arm,
loosen the mower deck belt and remove the belt
from the RH mower spindle-pulley (Fig. 434).
Fig. 434 DSCN-0020a
5. Raise the mower deck to the top transport position.
Remove the mower blade from the spindle shaft.
6. Remove the 6 ange nuts retaining the spindle
assembly to the mower deck and remove the spindle
assembly from the deck (Fig. 435).
Fig. 435 DSCN-0079a
Mower Spindle Installation (2010 & Later
Model G3, 3000/5000/6000 Series Units)
Reverse the order of mower spindle removal (2010 &
later model G3, 3000/5000/6000 Series units).
1. Install the spindle assembly in the mower deck and
tighten the 6 ange nuts. Torque the nuts to 37 ± 4
ft-lbs. (50 ± 5.4 Nm).